| |
Active forum topics |
Windham County 5-Town Cooperative/Dummerston Meeting - 6/15/06ArticleWindham County 5-Town Cooperative/Dummerston Meeting, Attending: The meeting was held in the church basement nearest the DummerstonTown Offices; though fewer attended than expected, the meeting still proved productive. The meeting opened with introductions, during which Tom Lowell quickly updated the group on his plans for a tower and T1 line ("almost there") on his property at the corner of Cemetary Road in Dummerston. He noted that it was now imperative that a means of funding is arrived at, preferably with the proposed five-town cooperative in place. Tom made it clear, he is ready to move ahead, with or without the cooperative, though he hoped to do so WITH the cooperative, or able to retroactively deal with the funding issues (i.e., fund-raising, reimbursement, etc.) as part of the cooperative. Tom Bodett and Kevin Ryan reiterated the Dummerston Broadband poll (out of 950 mailed, 450 responded, 250 expressing their desire/need for broadband access), noting that 314 residences on the Dummerston 9-1-1 map presently had no broadband access. A discussion of the "price point" threshold followed, leading to further conversation on the Dummerston situation and sharing of the Dummerston map with the group, which opened circulation and discussion of the various town mapping that had been completed. Tom Lowell passed around the Dummerston topographical/9-1-1 map, highlighted with markers to indicate broadband access and lack of broadband access. Steve Bissette distributed copies of the Marlboro topographical/9-1-1 map prepared by Jim Mahoney, noting that only TWO Marlboro locations presently have broadband access: Marlboro College on South Road and Marlboro Elementary School on Route 9, each serviced by T1 lines. At this point, Tim Flesher arrived, using the Marlboro map to note the placement of existing towers in Marlboro. Discussion followed, concentrating on the methodology of determining which locations in Marlboro might best serve as placement for towers to establish service for the largest portion of the community; this led to discussion of the same issue for Dummerston. Leigh Brady presented the Putney mapping, appropriately color coded (she had a large presentation map prepared, not handout copies), and its specs: 1058 units, of which only 320 have dial-up broadband access at this time. Leigh (and Benjie Crasin) discussed the particulars, noting which locations have DSL or coverage, and how the western half of Putney and all points east of interstate 91 (along River Road) do not have access. Tim Flesher indicated that a sizable region of West Putney is about to be covered by LastMileNet (also note Gregg Noble and Tim Flesher indicated that Tim is now working with Gregg and Great Auk, and is no longer with LastMileNet). Tom Bodett and Tom Lowell redirected discussion to the need and nature of the proposed cooperative. Tom Lowell asked Gregg and Tim to address their business and potential (or preferred) methods of dealing with such a cooperative. Both did so: Gregg affirmed it would be preferable to work with a cooperative, that would own the infrastructure (e.g., towers, "radios," hardward, etc.), while Tim noted the average cost of needed equipment per person served would be between $500-700 (Tim charges $250-300 up front fees at present). Gregg noted the Great Auk model is funded in part by advertisers and subscribers (the ads appear on the homepage), and the importance of the five town representatives filling out the Great Auk/Optima application forms Gregg emailed to the group. Reg Rockefeller noted that Verizon recently refused installation of a T1 line to her home unless she changed service to a business line; via sover.net, the cost of a T1 line is presently $350-432 per month, a prohibitive amount for most (if not all) individuals. Clearly, the need to form the cooperative and proceed with a communal solution to this dilemma is vital. Intensive discussion followed of the proposed cooperative's means, methods and strategy (or strategies), and the need to complete the present mapping project for all five towns to arrive at mapping of potential towers, serviced areas and frequencies. Discussion of T1 lines, repeaters, and the problems presented by metal roofs followed, leading Tom Bodett to ask "How should we approach forming this cooperative and making our plan?" FUNDING: ACCOUNTANT: TOWN ZONING ISSUES: The group determined the following course of action must be pursued ASAP, in preparation for the next meeting (tentatively July 11 or July 18th): 1. Topographical/population maps: 2. Survey maps by/for Optima/Great Auk, to determine best tower/repeater placement and coverage per town: 3. Photos of Antennae: 4. Local Searches, per Town, for the Best Viable Sites: 5. Each Town Proposing TWO Tower/Antennae Sites: To complete #4 and 5, it was determined that each town should come up with the modest sum of $300 per town for this process. The meeting closed with a proposed meeting date of July 11 (if that isn't good, July 18th is our alternative) -- to be determined via email exchange with the group. The hope/need for Walter and Jodie French's involvement in the July meeting was noted; meeting adjourned. |
| | About this site | |